Work With Us

Elite Estimating SolutionsZip Code Based Estimates

Estimates and takeoffs, done accurately by our estimators — based at your project's actual location.

Find More Work

More bids to price, from where contractors already look.

ConstructConnectNew projects breaking daily
Explore →
PlanHubGet matched with bid invites
Explore →
👆 Tap Your Role

Who are you?

Click any card to jump straight to it — or just scroll down and walk through all five, one after another.

Click a card — it's interactive
Role 01 / Owners · CEOs · Presidents · GMs

Growth is usually capped by pricing capacity, not demand.

OWNERS / 01

Capacity limits growth more than demand does.

Most companies aren't turning down work because they don't want it — they're turning it down because there's no one to price it in time. We act as extra estimating capacity on demand, so a bid never goes unpriced just because your team is full.

OWNERS / 02

A full-time estimator is a fixed cost, we're not.

Salary, benefits, and software licenses run whether there's one bid or twelve. You only pay us when there's a project to price — no idle cost in slow months, no layoffs to consider in a downturn.

OWNERS / 03

Growth almost always outpaces hiring.

By the time a new estimator is hired and trained, the surge that justified the hire has usually passed. We give you capacity immediately, no hiring or training cycle attached.

OWNERS / 04

You keep final say on every number.

We price the bid, you decide what goes in front of the client. More capacity without giving up control of margins, strategy, or the client relationship.

OWNERS / 05

Testing us costs less than a bad hire.

A mis-hire costs months of ramp-up and a redo. Send us one project first — you'll know within a single bid cycle whether outside capacity actually helps.

Role 02 / Project Managers

A rushed estimate is where the mistakes hide.

PM / 01

Rushed estimates are where mistakes hide.

Missed quantities and scope gaps happen most often the night before a bid is due. We take the time pressure off the takeoff, so the number going out isn't the first one anyone had time to check.

PM / 02

You shouldn't have to pick which bid gets attention.

When two or three bids land the same week, something gets shortchanged. Send us the overflow bid and your team stays focused on the ones they're already deep into.

PM / 03

Late plans don't have to mean a late bid.

Our turnaround is built around tight, real-world windows — most estimates back in 24–48 hours.

PM / 04

A second set of eyes catches what a rushed one misses.

Run an independent takeoff on a bid you've already priced. If the numbers line up, you submit with confidence. If they don't, you caught it first.

PM / 05

A late estimate delays everything after it.

Scheduling, crew planning, and material ordering all get pushed back once a job is won late. A faster estimating step keeps the whole downstream schedule on track.

Role 03 / Estimators

Backup for the weeks three bids land at once.

ESTIMATORS / 01

We're backup, not a replacement.

Send us the projects you don't have bandwidth for — you keep running your department exactly the way you already do, just with a release valve during heavy weeks.

ESTIMATORS / 02

Most teams are sized for a normal week, not the week three bids land.

Use us specifically for overflow weeks. No restructuring, no added headcount to manage — just extra hands when volume spikes.

ESTIMATORS / 03

A missed line item under deadline pressure loses bids.

Offload the takeoff on your busiest bid to us, so the one done under the most time pressure isn't also the one most likely to have a gap in it.

ESTIMATORS / 04

Your process doesn't change.

You still review every number and decide what's usable — we just hand you a finished takeoff to check, same as if a second estimator on your own team had done it.

ESTIMATORS / 05

No onboarding, no new software to learn.

Send plans, get a number back. If you can hand a project to a colleague, you already know how to work with us.

Role 04 / General

Why outsourcing helps you grow.

GENERAL / 01

More bids priced means more bids won.

Growth is bottlenecked by estimating capacity more often than by available work. Outside support removes that bottleneck directly.

GENERAL / 02

Scaling headcount every time demand grows isn't sustainable.

We let you scale the estimating desk up or down per project, so growth doesn't require a matching hiring cycle every time.

GENERAL / 03

One in-house estimator can't be an expert in every trade.

Our team covers every major division — concrete, MEP, electrical, roofing, and more — so a gap in one person's expertise doesn't become a gap in your bid.

GENERAL / 04

Committing to a new vendor feels risky.

Start with a single project. You'll see the accuracy and turnaround firsthand before deciding whether to use us again.

Role 05 / Split the Load

Keep pricing strategy entirely in-house — we just handle the takeoff.

SPLIT THE LOAD / PROBLEM

Handing over an entire bid feels like giving up too much control.

For some teams, sending out pricing along with the takeoff is a step too far.

SPLIT THE LOAD / SOLUTION

Split the work instead.

We handle the takeoff and quantities; you keep pricing strategy entirely in-house.

SPLIT THE LOAD / HOW IT WORKS

Send plans → we take off quantities → you price.

Every material, every measurement, by trade division — then the number, the markup, and the final call stay yours.

SPLIT THE LOAD / WHO IT'S FOR

Estimators buried in quantities, confident in their pricing.

Owners who want relief without losing control of margins. Teams testing outside help for the first time without a full handoff.

This isn't a smaller version of full estimating — it's a different partnership. You still win or lose the bid on price. We just make sure the numbers under it are right.

Ready to send us your next bid?